Bathroom Remodeling in Las Vegas, Scoped Before Demolition Starts.

Waterproofing and drainage falls planned before a single tile is ordered, one crew from layout to final walkthrough. Your quote is free and carries no obligation.

Get your free quote

Takes about a minute. Tell us the scope and we come back with a free, no-obligation quote.

1Service2Scope3Timeframe4Contact

What service do you need?

What do you want the bathroom to become?

How soon do you need this done?

Where should we send your quote?

Free, no obligation.

Local teamClear next stepsNo obligation
Sound familiar?

A small room where everything has to be right

Grout that will not come clean, a shower that never quite drains, and a layout that wastes half the floor. Bathrooms are the smallest rooms in the house and the least forgiving of a compromise.

The part that decides all of it sits behind the tile. Tanking and the slope to the drain are invisible when they are done right and expensive to reopen when they are not.

That is exactly why Angel Touch Remodeling does it differently.

What we do

Every job, handled end to end

What we plan before anyone swings a hammer

Angel Touch Remodeling remodels bathrooms in Las Vegas, and the scope is settled before demolition. Here is what gets decided first, because these are the things that cannot be changed cheaply once the walls are open.

What sits behind the tile matters more than the tile does.
HOW IT WORKS

Three steps from idea to finished

  1. Tell us what you want changedThe form takes about a minute: the rooms involved, the scope, and roughly when you want it done.
  2. Walk the spaceSomeone looks at the actual space and talks through what is possible before a number is put on it.
  3. The work gets doneA scheduled crew, one point of contact, and a space put back together at the end of it.

Common questions

What does a quote cost, and am I committing to anything?

The quote is free and carries no obligation. Someone walks the actual bathroom, looks at the drainage and the stack, and talks through what is possible before a number is put on it. If you decide not to go ahead, that is the end of it.

Can the toilet be moved?

Sometimes, but it is the hardest fixture to relocate because it connects to the soil stack and needs adequate fall. Basins and showers are far more flexible, so the layout is usually planned around where the WC can go. We settle that at the walkthrough, not mid-demolition.

Why does the scope get set before demolition?

Because waterproofing, drainage falls, ventilation, and a level threshold all have to be decided before the walls close up. Deciding them on the fly is how a bathroom job stalls. Settling them first is what keeps the crew moving to the walkthrough.

Can you build a bathroom my parent can use safely?

Yes. Accessible and walk-in bathrooms are one of the things we build. A level-access shower, grab-ready walls, and a wider door opening are planned in from the start, because adding a level threshold later means taking the floor back up.

Who is actually in my house doing the work?

One crew handles the job from layout through the final walkthrough, with one point of contact. The bathroom gets put back together at the end of it rather than left open between trades.

One minute of questions, then a real answer from a real person.

Get My Free Project Quote
Call (702) 347-1178